Wellbore Stability Above All: Interview with Cory Fehr, Integrity Insitu

Published
American Association of Petroleum Geologists (AAPG)

As drilling conditions evolve with new technologies, wellbore stability is more important than ever. Welcome to an interview with Cory Fehr, Integrity Insitu. Cory and his team have invented a tool that can conduct downhole tests to assure wellbore stability and integrity.

What is your name and background?

Cory Fehr
Cory Fehr
Cory Fehr, Founder of Integrity Insitu and active in oil and gas industry for 23 years in roles ranging from Reservoir Engineering Technologist to Operations Coordinator.

What is the name of your company and a brief history?

Integrity Insitu.  Born in 2013 out of frustrations related to geomechanics data collection, we’ve invented a direct measurement downhole tool that incorporates multiple in situ tests with all data seen at surface in real-time.

How did you become interested in innovation and new technologies?

Shallow tool in mast
Shallow tool in mast
Out of necessity, to address the pains associated with geomechanics data. Have always been interested in mechanical systems and logging tools, having applied them to dozens of projects.

What is the name of your new technology?

Insight Tool (IN SItu GeomecHanics Testing)

What is the problem that is solves?

The issues associated with attempting to capture core for geomechanics testing purposes.

What are opportunities that it opens up?

Rapid, repeatable and trusty rock strength and stress measurements for wellbore stability modelling, CCS or SAGD caprock investigation, or frac optimization via direct measurements captured from within the target lateral. Huge time and financial savings, and potential increases to production.

Please describe a few successful implementations.

Successful bench testing of both our shallow and deep prototypes has occurred, in which we compared lab data to our shear head component of the device.  Various parameters were also captured in situ during shallow prototype testing, with additional bench and field testing planned over the next 6 months.

What are your plans for the future?

Creating additional tools in a variety of sizes for use in offshore as well as onshore environments worldwide, along with transferring this technology into both the mining and civil engineering fields.

Insight tool shear head anchor

What Can I Do?

Add Item

Enter Notes:
 
* You must be logged in to name and customize your collection.
Recommend Recommend
Printable Version Printable Version Email to a friend Email to a friend

See Also: ACE Program Paper

ACE Program Paper Four Seasons Ballroom 4 A New Rock-Eval Methodology for Tight Oils A New Rock-Eval Methodology for Tight Oils Desktop /Portals/0/images/ace/2015/luncheon heros/ace2015-tp1-unconventional.jpg?width=100&h=100&mode=crop&anchor=middlecenter&quality=75amp;encoder=freeimage&progressive=true 14955

See Also: Webinar

Webinar Climate Change and Covid-19: Their Effect on the Middle East and Energy's Future Climate Change and Covid-19: Their Effect on the Middle East and Energy's Future Desktop /Portals/0/PackFlashItemImages/WebReady/MER-virtual-geo-yp-climate-change-and-covid-19-hero.jpg?width=100&h=100&mode=crop&anchor=middlecenter&quality=75amp;encoder=freeimage&progressive=true 57926

See Also: Explorer Article

Explorer Article Lowering Costs, Improving Efficiency in Offshore Oil Production Lowering Costs, Improving Efficiency in Offshore Oil Production Desktop /Portals/0/PackFlashItemImages/WebReady/lowering-costs-hero.jpg?width=100&h=100&mode=crop&anchor=middlecenter&quality=75amp;encoder=freeimage&progressive=true 67015
Explorer Article CCS and CCUS face many of the same challenges, but the U in CCUS provides revenue opportunities How the U Adds Value in CCUS How the U Adds Value in CCUS Desktop /Portals/0/PackFlashItemImages/WebReady/how-the-u-adds-value-in-ccus-hero.jpg?width=100&h=100&mode=crop&anchor=middlecenter&quality=75amp;encoder=freeimage&progressive=true 66934

See Also: Explorer Director’s Corner

Explorer Director’s Corner The recent pause on all pending LNG permit requests comes at a time when demand is expected to increase 50 percent by 2040. Biden Administration Hamstrings LNG Potential Biden Administration Hamstrings LNG Potential Desktop /Portals/0/PackFlashItemImages/WebReady/curtiss-david-large-aug22.jpg?width=100&h=100&mode=crop&anchor=middlecenter&quality=75amp;encoder=freeimage&progressive=true 66906